Page 138 - UNESCO_Zatec_MP_2021
P. 138
D.2.2.8. – C SWOT C.1.B/5 - SWOT C.2.B/15
CONSERVATION AND RESTORATION OF THE PROPERTY
COMPONENT PART 02
D. PROPOSAL SECTION OF THE MANAGEMENT PLAN
– PUBLIC SPACE IN THE TERRITORY OF THE PROPERTY
Chmelařské Square in Žatec
Revitalisation and restoration of areas and greenery in the square, street furniture, information systems, art elements
It is necessary to create an architectural study and develop project documentation.
A barrier-free solution is assumed.
Performed / Guaranteed: Medium Term Measures
The town of Žatec, Site Manager, World Heritage Coordinator 2024
D.2.2.8. – D SWOT C.1.B/5 - SWOT C.2.B/15
CONSERVATION AND RESTORATION OF THE PROPERTY
COMPONENT PART 02
– PUBLIC SPACE IN THE TERRITORY OF THE PROPERTY
Completion of the repair of Nerudovo Square in Žatec
Completion of the revitalisation of the area by adding a piece of public art..
Performed / Guaranteed: Short Term Measures
The town of Žatec, Site Manager, World Heritage Coordinator 2022
D.2.2.8. – E SWOT C.1.B/5 - SWOT C.2.B/15
CONSERVATION AND RESTORATION OF THE PROPERTY
COMPONENT PART 02
– PUBLIC SPACE IN THE TERRITORY OF THE PROPERTY
Horova Street in Žatec
138 Revitalisation and restoration of the street in connection with the reconstruction of the Parish Garden and the Malt House of the
Žatec Brewery
It is necessary to create an architectural study and develop project documentation.
A barrier-free solution is assumed.
Performed / Guaranteed: Medium Term Measures
The town of Žatec, Site Manager, World Heritage Coordinator 2024
D.2.2.8. – F SWOT C.1.B/5 - SWOT C.2.B/15
CONSERVATION AND RESTORATION OF THE PROPERTY
COMPONENT PART 02
– PUBLIC SPACE IN THE TERRITORY OF THE PROPERTY
Poděbradova Street in Žatec
Restoration of cobblestone surfaces and paving.
It is necessary to create an architectural study and develop project documentation.
A barrier-free solution is assumed.
Performed / Guaranteed: Medium Term Measures
The town of Žatec, Site Manager, World Heritage Coordinator 2024