Page 88 - UNESCO_Zatec_MP_2021
P. 88
Park below the Nákladní Street
The visually important area below the Nákladní Street next to the western boundary of the nominated component.
It is envisaged to convert it into a park with equipment for sport and leisure activities, street furniture and a water
B. ANALYTICAL SECTION OF THE MANAGEMENT PLAN
feature. The visual axis from Podměstí will be maintained. The design of the area will be a subject of an architectural
competition.
Sport Hall
The building of a new gym at the southern edge of the town. It is in the planning stage and the project will be subject
to an architectural competition.
Park Bufo – Bufo
Extension of the existing park and planting more greenery towards the residential area of Žatec JIH. It is in the stage
of the development of the architectural concept design.
Parking and greenery in the Stavbařů Street
Adding more parking spaces and paths lined with trees for dog walkers. It is in the stage shortly before the selection
of a contractor.
Revitalisation of the Ohře embankment
The ongoing project including greenery expansion, creating areas for leisure, adding benches on the embankment
slopes, improving the riverbed for a possibility to dip in, adding street furniture and lighting.
Refurbishment of the Chaloupka building and of the football stadium
The training facility of the football club including a pub and terraces which will be the centre point of the leisure area
along the river Ohře. It is in the stage of preparing the specification for an architectural competition.
Sport facility and leisure area at the Šafaříkova Street
Adding more amenities in the residential area next to the property including a new multi-purpose sport ground and
more greenery.
The residential area and the park at Lipovka
88 A recently allocated area at the southern edge of the town. It is envisaged for construction of residential buildings
with underground parking complemented with a large park including a water body. The project is in the stage of the
development of the architectural concept design which should be followed by the land development study.
Refurbishment of the Havlíčkovo náměstí Square
The new design of the square is the result of the architectural competition. The project is in the stage of selecting the
architect/engineer to prepare the design for the planning consent and the project implementation.
Park at the perimeter of the Urban Heritage Zone
The rehabilitation of the park at the perimeter of the historic town centre. It is in the stage of the project documentation
development for Phase 1.